Tower Crane Dismantling Method Statement !!top!! Jun 2026

A safe zone must be barricaded, with warning signs and guards to prevent unauthorized entry.

Ensure all electrical systems are locked out/tagged out (LOTO) before disconnecting power cables. 5. Post-Dismantling Site Clearance: tower crane dismantling method statement

This method statement outlines the procedures for the safe dismantling of the tower crane described above. The scope includes the recovery of the crane components from its erected position, lowering them to ground level, and loading them onto transport vehicles for removal from site. The dismantling will be performed using a mobile crane (assist crane) and the tower crane’s own climbing system where applicable. A safe zone must be barricaded, with warning

The dismantling process generally follows the reverse order of assembly to maintain the center of gravity: Method Statement Dismantle Tower Crane - Scribd The dismantling process generally follows the reverse order

Conduct a walkthrough to identify hazards and ensure the ground is stable for the auxiliary mobile crane Weather Monitoring:

Key constraint: The mobile crane’s jib must reach the top of the tower crane without exceeding 75% of its rated capacity—a legal margin in most jurisdictions.

The dismantling work will be carried out in the following sequence: